Zoning and Land Development Fees

On October 21, 2019, the City Commission approved Resolution No. 2019-50, Amendments to Schedule of Fees for Zoning and Land Development. The fees became effective on January 1, 2020.

Chapter 74. Administration

Article I. In General

(1)  The city commission adopts the amended application and permitting fees in accordance with the schedule listed below and shall review and amend such fees as deemed appropriate by city staff.

(2)  The following is the amended application and permitting fee schedule for zoning and land development.

Development Services Project Review

LDR

Land Development Review (includes engineering review and up to four (4) inspections):

 

 

Single Family Residence (SFR)

$325.00 plus consulting fees.

 

Within an engineered subdivision prior to 1995

$325.00 plus consulting fees.

 

Within an engineered subdivision after 1995

$160.00 plus consulting fees.

BFE

Review of engineering study requesting amended Base Flood Elevation

$50.00 plus consulting fees.

FPM

City engineering study to resolve Base Flood Elevation/Closed Basin disputes

$500.00 plus consulting fees.

 

Change of Grade for sites that are not subject to subdivision or site plan review within two (2) years of development order:

 

DO

Development Order for lots two (2) acres or less

$200.00 plus consulting fees.

 

Development Order for lots more than two (2) acres

$50.00 per acre up to $500.00 plus consulting fees and other required review costs.

DOE

Development Order Extensions

$300.00 plus consulting fees.

DOM

Development Order Modifications

$300.00 plus consulting fees.

DSA

Appeals: Technical and Procedural

$500.00 plus consulting fees.

 

Site Plan Review:

 

CON

Conceptual Site Plan

$300.00 plus consulting fees.

FSP

Final Site Plan: Commercial and Multi-Family

$1,000.00 plus consulting fees.

 

Subdivision Review:

 

SKP

Sketch Plan

$150.00 plus consulting fees.

PP

Preliminary Plat

$1,000.00 plus consulting fees.

FP

Final Plat

$500.00 plus consulting fees.

DSR

Each re-submittal after the second DRC re-submittal

$100.00 plus consulting fees.

CC

Certificate of Concurrency

$300.00 plus consulting fees.

EZ

Easement and Right-of-Way Vacation

$400.00 plus consulting fees.

CL

Combination of Lots

$100.00 plus consulting fees.

 

Subdivision Exemption

$200.00

ZON

Zoning and Land Use Designation Letter

$50.00

 

Development Services Permits

TR

Tree Removal Permit (includes two (2) inspections):

$250.00 plus consulting fees. (this is a permit fee and is exclusive of any fees owed to the City Tree Replacement Fund at $48.00 of CSSI).

TRCC

Certificate of Compliance for Tree Removal Permit

$36.00

MOD

Model Sales Center

$150.00 plus consulting and other required review fees on un-platted property and unrecorded subdivisions.

 

Pre-Construction Meetings:

 

 

No fee for the first meeting, additional meetings

$300.00 each plus consulting fees.

WET

Wetland Alteration Permit

$200.00 plus consulting fees and 1:1 mitigation of $1 and $1 times mitigation for anything more than 1:1.

 

Resolutions and Ordinances

ANX

Annexations

$750.00

CU

Conditional Use

$300.00 plus consulting fees.

ZV

Zoning Variance

$400.00 

CR

Commercial Rezoning

$900.00 plus consulting fees.

RR

Residential Rezoning

$800.00 plus consulting fees.

 

Future Land Use Map Amendments

SCPA

Small Scale Map Amendments

$2,500.00 plus consulting fees.

LCPA

Large Scale Map Amendments

$3,000.00 plus consulting fees.

DRI

Development of Regional Impact (DRI)

$10,000.00 plus consulting fees.

TXT

LDC, Zoning or Comprehensive Plan Text Amendments

$3,000.00 plus consulting fees.

 

Planned Unit Developments:

 

PUD

Residential, Mixed and Business Planned Unit Developments

$3,500.00 plus consulting fees.

 

Amendments to PUD requiring no public hearings

$300.00 plus consulting fees.

DSR

Re-submittals after first re-submittal during review process

$100.00 each plus consulting fees.

 

Escrow Accounts

TRF

Tree Replacement Fund

$48.00 per CSSI of replacement stock not on site.

SF

Sidewalk Fund:
4' wide 4" deep

 

$14.76 per linear ft. new sidewalk installation.

 

 

$17.96 per linear ft. repair/removal/replacement of existing sidewalk.

 

4' wide 6" deep

$16.92 per linear ft. new sidewalk installation.

 

 

$23.72 per linear ft repair/removal/replacement of existing sidewalk.

 

5' wide 4" deep

$18.45 per linear ft. new sidewalk installation.

 

 

$22.45 per linear ft. repair/removal/replacement of existing sidewalk.

 

5' wide 6" deep

$21.15 per linear ft.  new sidewalk installation.

 

 

$29.65 per linear ft. repair/removal/replacement of existing sidewalk.

 

6' wide 4" deep

$22.14 per linear ft.  new sidewalk installation.

 

 

$26.94 per linear ft.repair/removal/replacement of existing sidewalk.

 

6' wide 6" deep

$25.38 per linear ft.  new sidewalk installation.

 

 

$35.58 per linear ft. repair/removal/replacement of existing sidewalk.

 

Copies/Misc

24" × 36" black/white plans

$2.00 per page.

36" × 48" color maps

$15.00 each.

Benchmark CD

$10.00 each.

Any recorded CD from GIS

$10.00 each.

“Minor amendments” not altering the intent and purpose of the approved master development plan or development agreement may be approved by the appropriate enforcement official after departmental review and comment. Examples of minor amendments include de minimis design-oriented changes to landscaping, parking, or building elevation. PUD amendments that are determined to be major revisions to the MDP and/or DA will need to be reviewed and processed under section 110-1101 of the Land Development Code. Major amendments can be described as materially altering proposals that involve changes of uses, density/intensity, reconfiguration of lots, etc.” (Land Development Code Section 110-310(k)(5)d.)

(Res. No. 2005-14, § 2, 5-16-2005; Res. No. 2005-38, §§ 1, 2, 10-3-2005; Res. No. 2006-13, § 2, 4-17-2006; Res. No. 2007-15, § 2, 7-16-2007; Res. No. 2007-24, § 2, 8-20-2007; Res. No. 2010-34, § 1, 10-18-2010, § Res. No. 50-2019.)